System |
Library Name |
County |
Sen. Dist. |
Asy. Dist. |
Project Description |
Amount |
System Total |
Brooklyn Public Library |
System Total |
$293,975,000 |
|
Arlington |
Kings |
18 |
54 |
ADA Bathrooms, Plumbing system, New Furniture & Equipment, Interior Renovation, Exterior Renovation |
$6,000,000 |
Bay Ridge |
22 |
64 |
Boiler, HVAC |
$1,750,000 |
Bedford |
25 |
57 |
Boiler, Windows |
$1,750,000 |
Borough Park |
17 |
48 |
Interior Renovation, Windows, New Furniture & Equipment |
$5,200,000 |
Brighton Beach |
23 |
46 |
Interior Renovation, Safety and Security Enhancement, Exterior and Windows, Boiler, New Furniture & Equipment |
$4,700,000 |
Brooklyn Heights |
25 |
52 |
Boiler Replacement, Roof & Roof Bulkhead replacement, New Elevators & Machine Room, Site Drainage and Waterproofing, Safety and Security Enhancements, Lighting Upgrade & BMS controls, HVAC System replacement |
$9,275,000 |
Brower Park |
25 |
43 |
Acquisition estimated cost, New Furniture and Equipment, Safety and security enhancements, Roof, Interior Renovations, HVAC and controls, Boiler, ADA Bathrooms |
$8,600,000 |
Brownsville |
20 |
55 |
Interior Renovation, Safety and Security Enhancement, Façade Rehab, New Furniture & Equipment |
$3,650,000 |
Bushwick |
18 |
53 |
Boiler, Safety and Security Enhancement, New Furniture & Equipment, Interior Renovation, Exterior Rehabilitation |
$4,050,000 |
Canarsie |
19 |
59 |
ADA Bathrooms, Roof, HVAC and controls |
$2,200,000 |
Carroll Gardens |
26 |
52 |
Exterior Renovation & Windows, Windows, Safety and Security Enhancement, New Furniture & Equipment, Interior Renovation, Boiler |
$6,350,000 |
Central |
21 |
57 |
Window Replacement, System upgrade, Environmental Controls for Decks, Air Delivery System, Plumbing upgrade, Abatement, ADA Bathrooms - All levels, New flooring finishes throughout, Building-wide, Furniture and Equipment, Social Sciences, Science and Industry, Multilingual Center, Language and Literature, Art and Music, Escalator upgrade, Glass Block Wall Restoration & Waterproofing, Lighting, Ceiling and Wall Restoration, Restore all wood finishes, Exterior Site work and Landscaping, Exterior Exits and Plaza Cheek Walls, Deck Entrance Canopy, Exterior Lighting, Renovate/replace skylights, Exterior Roof Access Doors Replacement, Parapets, Roofs, Building Façade |
$67,750,000 |
Clarendon |
21 |
42 |
Interior Renovation, Safety & Security Enhancements, Boiler, New Furniture & Equipment |
$2,850,000 |
Clinton Hill |
25 |
57 |
Interior Renovation, Roof, New Furniture & Equipment, |
$2,850,000 |
Coney Island |
23 |
46 |
New Furniture and Equipment, Roof, Exterior Rehab, new Lintels and windows |
$2,950,000 |
Cortelyou |
17 |
44 |
Roof, Safety and Security Enhancement |
$1,000,000 |
Crown Heights |
20 |
43 |
Acquisition estimated cost, Safety & Security Enhancement, Roof replacement, HVAC, Boiler |
$4,850,000 |
Cypress Hills |
18 |
60 |
Boiler |
$750,000 |
Dekalb |
18 |
54 |
Exterior Renovation, Window Replacement/Restoration, Basement Renovation, Safety and Security Enhancement |
$3,500,000 |
Dyker |
22 |
46 |
New Windows & Masonry Restoration, New Furniture & Equipment, Interior Renovation |
$3,500,000 |
East Flatbush |
21 |
58 |
Exterior Restoration and Windows, New Furniture & Equipment, Interior Renovation |
$4,100,000 |
Eastern Parkway |
20 |
43 |
Arched Window Rehabilitation, Restoration of Chimney Stack, New Furniture & Equipment, Interior Renovation, HVAC, Hazardous Material Abatement, Boiler |
$7,850,000 |
Flatbush |
21 |
43 |
Abatement and restoration of finishes, Safety and security enhancement |
$900,000 |
Flatlands |
19 |
41 |
ADA Compliance - Entrance, New Furniture & Equipment, Interior Renovation |
$3,500,000 |
Gerritsen Beach |
22 |
59 |
Façade Restoration and windows |
$1,500,000 |
Gravesend |
22 |
45 |
Boiler, Safety and security enhancements, New furniture & equipment, Interior Renovation, HVAC and controls |
$4,300,000 |
Highlawn |
17 |
47 |
Boiler, Safety & Security Enhancements, HVAC and controls |
$1,800,000 |
Homecrest |
17 |
45 |
Acquisition estimated cost, Safety and Security Enhancement, Roof, HVAC, Boiler |
$4,850,000 |
Jamaica Bay |
19 |
59 |
Boiler, Safety and Security Enhancement, Roof, HVAC |
$2,700,000 |
Kings Bay |
19 |
41 |
Boiler, Safety and Security enhancement, Roof, HVAC, Exterior restoration |
$4,050,000 |
Leonard |
18 |
53 |
ADA Upgrades, Safety and Security Enhancement, New Furniture & Equipment, Interior Restoration, Historic Window Restoration, Façade Restoration |
$7,500,000 |
Macon |
25 |
56 |
Rear retaining wall |
$600,000 |
Mapleton |
17 |
48 |
Exterior restoration, Safety and Security Enhancement, Windows and doors |
$1,850,000 |
Marcy |
25 |
56 |
ADA Compliance - Bathrooms, Safety and Security Enhancement, Roof, New Furniture & Equipment, Interior Rehabilitation, Exterior restoration, Boiler |
$5,000,000 |
McKinley Park |
22 |
49 |
ADA Compliance - Bathrooms, Windows & Doors, Safety & Security Enhancements, Roof, Plumbing system, New Furniture and equipment, Interior Renovation, HVAC, Boiler |
$6,550,000 |
Midwood |
17 |
48 |
Boiler, Safety & Security Enhancements, HVAC and controls, Roof |
$2,800,000 |
Mill Basin |
19 |
59 |
ADA Compliance - Bathrooms, Safety & security enhancements, Roof, Exterior, windows and doors |
$2,150,000 |
New Lots |
19 |
60 |
Elevator, Windows, New Furniture & Equipment, Interior Renovation, Boiler |
$5,350,000 |
New Utrecht |
22 |
47 |
Interior Renovation, New Furniture & Equipment |
$4,750,000 |
Pacific |
25 |
52 |
ADA Compliance - Entire Branch, Windows, Safety and Security Enhancement, New Furniture & Equipment, Interior Renovation, HVAC, Exterior Restoration, Boiler |
$10,200,000 |
Paerdegat |
21 |
59 |
Acquisition estimated cost, Safety and Security Enhancement, Roof, HVAC, Boiler, Roof, HVAC, Boiler, ADA Compliance - Bathrooms |
$5,350,000 |
Park Slope |
21 |
44 |
Roof and Restore skylights, Exterior Rehab and Windows |
$3,000,000 |
Red Hook |
25 |
51 |
Exterior Rehab, Roof, HVAC |
$3,200,000 |
Rugby |
21 |
58 |
Exterior Fence and Site work, New Furniture & Equipment |
$1,100,000 |
Ryder |
17 |
48 |
Boiler, New Furniture & Equipment, Interior Renovation, Exterior Rehab |
$5,050,000 |
Saratoga |
25 |
55 |
Abatement, Safety & Security Enhancements, New Furniture & Equipment, Interior Renovation |
$4,150,000 |
Sheepshead Bay |
23 |
45 |
Acquisition Estimated Cost, Roof, Plumbing & Exterior Drainage System, New Furniture & Equipment, Interior Renovation, HVAC, Exterior Rehab, Boiler, ADA Compliance - Entire Branch |
$10,050,000 |
Spring Creek |
19 |
60 |
Boiler, Safety & security enhancements, HVAC |
$1,800,000 |
Stone Avenue |
19 |
55 |
New Windows & Doors, Side Entry Steps, Roof, Repoint & Rehab Limestone, Public Self Service Improvements |
$2,400,000 |
Sunset Park |
20 |
51 |
Swing Space, Branch Modernization |
$4,750,000 |
Ulmer Park |
22 |
47 |
Boiler, New furniture and equipment, Interior Renovation, HVAC |
$5,100,000 |
Walt Whitman |
25 |
57 |
ADA Compliance - Bathrooms, Safety and Security Enhancement, New Furniture & Equipment, Interior Renovation, HVAC, Exterior Rehab, Boiler |
$6,500,000 |
Washington Irving |
18 |
53 |
Boiler, Safety and Security Enhancement, New Furniture & Equipment, Interior Renovation, HVAC, Exterior Rehabilitation |
$7,650,000 |
Williamsburgh |
26 |
50 |
Boiler, Windows, Safety & Security Enhancements, Landscaping, Fence & Site work, HVAC, Exterior Rehabilitation |
$4,850,000 |
Windsor Terrace |
21 |
44 |
ADA Compliance - Bathrooms, Safety & Security Enhancements, New Furniture & Equipment, Interior Renovation |
$3,200,000 |
System |
Library Name |
County |
Sen. Dist. |
Asy. Dist. |
Project Description |
Amount |
System Total |
Buffalo & Erie County Public Library |
System Total |
$125,677,800 |
|
Amherst Public Library/ Audubon Library |
Erie |
61 |
146 |
Construct 6,000 sq ft addition -children's area expansion, expansion to current meeting room and additional meeting rooms |
$4,500,000 |
Amherst Public Library/ Eggertsville-Snyder Library |
61 |
146 |
Replace roof; and replace HVAC system with energy efficient unit |
$175,000 |
Aurora Town Public Library |
59 |
147 |
Expansion or new facility, including additional space for meeting/program room, staff offices, collections, patron seating, public access computers, parking |
$5,245,800 |
Boston Free Library |
59 |
147 |
Interior and exterior renovations including new energy efficient windows; rehabilitate vinyl siding; adding more effective outdoor lighting; construct ADA compliant access to community room; and replace furnace |
$200,000 |
BECPL - Central Library |
63 |
141 |
Space renovation/reconfiguration/asbestos abatement. Exterior modifications would create a plaza commons area to create a vibrant open space in the heart of downtown. The project will utilize green design and energy efficiency features; provide more self-service opportunities; provide additional opportunities for collaborative use of this prime downtown space. See: http://www.buffalolib.org/content/library-system/re-imagine |
$65,580,000 |
BECPL - Crane Branch |
60 |
149 |
Rehabilitate and expand facility; incorporate green technology; create rooftop reading/reception space; install ADA elevator to 2nd floor community meeting & performance spaces; rehabilitate and reconfigure 2nd floor meeting space & restrooms to ADA standards; and upgrade electrical service to meet modern technology needs |
$3,877,000 |
BECPL - Dudley Branch |
63 |
142 |
Renovate and expand facility - provide needed community meeting space; replace existing floor slab, correct foundation issues and incorporate new wiring; replace exterior lighting with energy efficient units; improve interior lighting; and upgrade electrical for connectivity and computer use |
$1,919,000 |
BECPL - East Clinton Branch |
63 |
142 |
Expand existing facility, including land acquisition; replace existing floor to incorporate new wiring and electrical for connectivity and computer terminals |
$1,831,000 |
BECPL - East Delavan Branch |
63 |
141 |
Rehabilitate 1961 vintage library spaces; replace casework; improve ADA access including providing an elevator/restrooms to make all areas of the library accessible; rehabilitate and expand electrical service to meet modern technology needs; and rehabilitate foundation to eliminate water penetration |
$2,264,000 |
BECPL - Frank E. Merriweather, Jr. Branch |
63 |
141 |
Upgrade auditorium sound and lighting systems; reconstruct portion of roof to eliminate leaks and rehabilitated damaged ceilings; rehabilitate parking lot; reconstruct spalling sidewalks; add exterior digital signage and furnishings; and expand building security system |
$450,000 |
BECPL - Niagara Branch |
60 |
149 |
Renovate 1958 vintage public spaces including segmenting space for children's programming; improve space for teen use; add meeting room space; improve audiovisual capabilities in the auditorium; rehabilitate restrooms; and expand electrical service to meet modern public computing needs |
$1,477,000 |
BECPL - North Park Branch |
60 |
149 |
Replace current leased space with new facility (including land acquisition) |
$4,500,000 |
BECPL - Riverside Branch |
60 |
140 |
Expand facility to add community meeting space and storage; improve electrical service to meet modern public computing needs; renovate/reconfigure/rehabilitate 1986 vintage public spaces; and replace single pane windows and store front entry doors with energy efficient units; reconstruct roof drainage to eliminate leaks |
$2,039,000 |
Cheektowaga Public Library/Anna M. Reinstein Library |
63 |
143 |
Replace original building roofs (flat and inclined); expand meeting room and reconstruct restrooms to ADA standards; improve lighting by replacing fluorescent with LED fixtures and adding motion sensors; add assisted door openers to front entrance. |
$3,007,000 |
Cheektowaga Public Library/Julia B. Reinstein Library |
63 |
143 |
Replace roof (flat area and shingled area); and replace fluorescent light fixtures and metal halide fixtures with equivalent LED's (Interior and Exterior) |
$350,000 |
City of Tonawanda Public Library |
60 |
140 |
Expand parking lot; replace window in meeting room with full wall of glass with ADA doors to outside; reconfigure exterior space adjoining library to provide an outdoor program area; install canopy for shade in outdoor area; install energy efficient lighting throughout the building; and reconstruct entry from parking lot to improve ease of access and provide natural light |
$800,000 |
Clarence Public Library |
61 |
144 |
Replace aging boiler with more energy efficient unit |
$30,000 |
Collins Public Library |
59 |
147 |
Restore parking lot |
$20,000 |
Elma Public Library |
59 |
147 |
Upgrade electrical service to meet modern technology needs; and replace air supply ductwork and air return ductwork under floor |
$148,000 |
Grand Island Memorial Library |
60 |
145 |
Replace roof (12,400 sq. ft.) including insulation with more energy efficient system; and replace interior Lighting with energy efficient lighting |
$195,000 |
Hamburg Public Library: Lake Shore Branch |
60 |
149 |
Rehabilitate interior & exterior, abate asbestos and expand facility |
$2,550,000 |
Hulbert Library of the Town of Concord |
59 |
147 |
Parking lot renovation, insulate roof, update interior and exterior lighting for efficiency, new toilets and water fountain, replace water line to front of building |
$150,000 |
Lackawanna Public Library |
63 |
142 |
Interior and exterior renovations including updating the Community Room and Public Restrooms; replace/rehabilitate the sewer line to the street and the outside doors to loading dock; replace the front doors and all windows; construct a new elevator; expand the office space; resurface the parking lot and construct an additional lot for parking; and restore the exterior brick work. |
$800,000 |
Lancaster Public Library |
59 |
143 |
Rehabilitate existing concrete floor in building basement; replace deteriorated ceiling sections; replace roof ice shields; replace 40 year old public bathrooms; Rehabilitate roof to eliminate leaks; and enclose the downstairs book drop for fireproofing |
$60,000 |
Marilla Free Library |
59 |
147 |
Expansion and renovations to the existing building to accommodate patron needs by providing more space for: the collection; computer space for adults and children; programming; meeting space for community use. Improve building energy efficiency and incorporating green energy techniques by replacing lighting interior and exterior. Improve ADA access. Provide more staff workspace and storage for the building. |
$1,500,000 |
North Collins Public Library |
59 |
147 |
Expand library by creating a 28x40 sqft addition of dedicated children's room off of back of library; and increase entrance accessibility |
$570,000 |
Orchard Park Public Library |
60 |
142 |
2,400 square foot building expansion including a new Community Room to address the increasing meeting and programming needs of the community (the small 54 person capacity of the existing meeting room limits programming and creates disruption to regular library patrons) |
$1,440,000 |
Town of Tonawanda Public Library - Kenilworth Branch |
60 |
140 |
Expand building to include additional space for community room, staff office, storage, a new computer lab and study room; expand parking lot; install a security alarm system and new telephone system; and Reconstruct staff and public restrooms for ADA compliance |
$1,000,000 |
Town of Tonawanda Public Library - Kenmore Branch |
60 |
140 |
Reconstruct or replace building to include: expand Parking Lot; reconstruct the two offices on 1st Floor into a Computer Lab, Bookstore, Gallery or Vending Machine Area; upgrade telephone system; Reconstruct public restrooms on first floor for ADA compliance; add new boiler to supplement existing boiler |
$6,500,000 |
West Seneca Public Library |
59 |
142 |
Add elements to the current expansion project to include: creating a separate addition for a "Maker Space"/imagination Room; create an advanced computer room with latest software for graphics, video and science for digital literacy; add 3 additional small rooms for individual study/instruction, additional early literacy and Young Adult rooms; and provide additional acoustics throughout the public and meeting room areas of the library for enhanced noise reduction and reduced sound transmission in the open floor plan areas |
$12,500,000 |
System |
Library Name |
County |
Sen. Dist. |
Asy. Dist. |
Project Description |
Amount |
System Total |
Clinton-Essex-Franklin Library System |
System Total |
$5,496,200 |
|
CEF Headquarters |
Clinton |
45 |
115 |
Install safety railing in garage; install energy efficient lighting in garage; reconstruct collapsing driveway; reconfigure and equip videoconference room and telephone system |
$75,000 |
Champlain Memorial Library |
45 |
115 |
HVAC upgrades, central air, replace damaged chimney |
$75,000 |
Rouses Point Dodge Memorial Library |
45 |
115 |
Insulate and weatherize attic for increased energy efficiency; enlarge bathroom to meet ADA requirements for renovation of basement to accommodate a children’s area with bathroom, air conditioning, heat, and outside ramp; renovation of attic to accommodate a conference room, reference room, study area, and bathroom; installation of elevator or lift from main floor to attic; renovation of interior staircases (2) to attic and basement |
$350,000 |
Ellenburg Sarah A. Munsil Library |
45 |
115 |
Reconfigure main floor stack area and create new user space; Other: paint (old USPS mailbox) & install as a book drop at front of library; (Work accomplished to be determined by match requirements) |
$10,000 |
Mooers Free Library |
45 |
115 |
Create and equip a conference room and public access workstations for adult new learners, job seekers in new library building |
$35,000 |
Plattsburgh Public Library |
45 |
115 |
Reconfigure basement floor children's' room, install new public display shelving in first floor stack area ($15,000); reconfiguration of local history collection upstairs ($8,000); HVAC Capital Project ($250,000); new OPAC User station |
$250,000 |
West Chazy |
45 |
115 |
Install energy efficient lighting and windows on main floor, enlarge and reconfigure children's’ area |
$50,000 |
Black Watch Memorial Library, Ticonderoga |
Essex |
45 |
114 |
Replace leaking roof in Carnegie Library building |
$100,000 |
Elizabethtown Library Association |
45 |
114 |
Rehabilitate and paint outside of building; (Work accomplished to be determined by match requirements) |
$25,000 |
Essex, Belden Noble Library |
45 |
114 |
Improve ADA access in historic building |
$20,000 |
Hammond Library of Crown Point |
45 |
114 |
Basement renovations – sealing cement block, replace existing lighting, install 3,000 sq. ft. floor; exterior ramp to comply with ADA requirements; install ADA compliant bathroom; roof replacement; replace windows with energy efficient units (Work accomplished to be determined by match requirements) |
$75,000 |
Keene Public Library |
45 |
114 |
Enlarge ground floor stack space and install new flooring in keeping with building character, install public access Internet workstations |
$75,000 |
Keene Valley Library Assoc. |
45 |
114 |
Mulitphase building project to result in increased public program space and building efficiency |
$500,000 |
Keeseville Free Library |
45 |
114 |
Install new energy lighting and HVAC throughout building |
$20,000 |
Lake Placid Public Library |
45 |
114 |
Lighting and space improvements to local history room |
$30,000 |
Paine Memorial Library |
45 |
114 |
New windows; commercial air conditioning system; new lighting; wheelchair accessible restroom; considering building expansion but plans based on available funding and match requirements |
$500,000 |
Schroon Lake Public Library |
45 |
114 |
New library building Phase 1 |
$2,000,000 |
Sherman Free Library |
45 |
114 |
Handicapped ramp and accessible bathroom (would require addition to 1st floor) ($40,000); excavation to improve drainage around building, and sealing basement walls ($20,000); install air conditioning ($15,000) |
$75,000 |
|
Wadhams Free Library |
45 |
114 |
Replace roof, adding foam insulation and solar collectors ($20,000); add passive solar addition to south side of building ($25,000); parking improvements ($5,000) |
$50,000 |
|
Westport Library Association |
45 |
114 |
Energy upgrades for efficiency in historic building |
$25,000 |
|
Tupper Lake, Goff-Nelson Memorial Library |
Franklin |
45 |
115 |
New lighting by book drop area ($300); new flood lighting on front of library ($400); new electrical lines & outlets ($1,500); air conditioning ($20,000); new heat source for research room ($4,000); new cellar floor to make cellar more usable ($10,000); replace walls in cellar ($6,000); renovation of 2 bathrooms in cellar ($10,000); replacement of ceiling fans with more effective fans ($4,000) |
$56,200 |
|
Wead Library of Malone |
45 |
115 |
Rebuilding handicap access ramp ($100,000); installation of elevator (would require expansion per architect estimated cost of $1 million) |
$1,100,000 |
System |
Library Name |
County |
Sen. Dist. |
Asy. Dist. |
Project Description |
Amount |
System Total |
Four County Library System |
System Total |
$13,100,000 |
|
Broome County Public Library |
Broome |
52 |
123 |
Replace 18 public access computers; install new flooring in browsing area, replace 12 microfilm machines |
$90,000 |
George F. Johnson Memorial Library |
52 |
123 |
New parking lot, Modification/ installation of emergency exits (children's room and basement book sale room), Replacement carpeting, Remodeling of community meeting room |
$450,000 |
Lisle Free Library |
52 |
122 |
Parking lot and driveway; add solar panels; insulate cellar; expansion project; reconfigure space |
$183,000 |
Mary-Wilcox Memorial Library |
52 |
122 |
Replace all of the roofing, more foundation work, insulating, bookcases that need repairing, installing central air, repaving the parking lot, lighting. Construct addition |
$600,000 |
Nineveh Public Library |
52 |
122 |
Addition; siding; roof; disabled access ramp |
$100,000 |
Your Home Public Library |
52 |
123 |
Repair roof & water damage to Fire exit tower, Add elevator for ADA access, Replumb building, Waterproof foundation |
$3,500,000 |
Guernsey Memorial Library |
Chenango |
52 |
122 |
Overall renovation of entire building with space study |
$2,000,000 |
Moore Memorial Library |
52 |
122 |
Construct addition. Renovate bathroom for accessibility, restore masonry |
$1,109,000 |
New Berlin Library |
51 |
122 |
Expansion; porch replacement; siding |
$200,000 |
Oxford Memorial Library |
52 |
122 |
Solar panels |
$81,000 |
Sherburne Public Library |
51 |
126 |
restore cracked and stained plaster interior; increase attic insulation |
$100,000 |
Andes Public Library |
Delaware |
51 |
101 |
Renovation of storage space, rebuilding of deteriorating foundation |
$43,000 |
Bovina Public Library |
51 |
101 |
basement renovation including new accessible entrance and walkway; correct drainage/water seepage problems; increase the floor to ceiling height; new handicap accessible washroom; improve kitchen and craft room space for programs; new sheet rock, insulation, paint, flooring to include radiant heat, carpet, linoleum; re-do stairs to basement from inside; tables and shelving |
$200,000 |
Cannon Free Library |
42 |
101 |
Masonry work, repointing |
$10,000 |
Fairview Public Library |
51 |
102 |
Replace vinyl siding; painting |
$20,000 |
Franklin Free Library |
51 |
122 |
Installing accessible ramps, repairing sidewalk, installing accessible bathroom, installing an elevator, providing accessible computer workstations |
$85,000 |
Wm. B. Ogden Free Library |
42 |
122 |
replacing the 120-yr-old windows and entry doors with more energy-efficient alternatives. |
$15,000 |
Louise Adelia Read Memorial Library |
52 |
122 |
Library addition for meeting/local history space/elevator, Library portico needs to be replaced, Energy updates/solar/heat pump |
$1,000,000 |
Roxbury Library Association |
51 |
102 |
Driveway paving; windows; sills |
$34,000 |
Stamford Village Library |
51 |
102 |
Extensive front facade renovation. New lighting. Emergency exit signs. Window repair for energy efficiency. |
$85,000 |
Cherry Valley Memorial Library |
Otsego |
51 |
102 |
Replace disabled access ramp and walkway; replace interior lighting fixtures; replace storm windows; add disabled access bathroom |
$100,000 |
Harris Memorial Library |
51 |
121 |
New roof; renovation to siding and shutters; addition for public computers/technology room |
$70,000 |
Huntington Memorial Library |
51 |
121 |
Insulation of the building, Repair of some retaining wall, Repair of ceiling tiles |
$60,000 |
Kinney Memorial Library |
51 |
121 |
Addition |
$1,000,000 |
Village Library of Cooperstown |
51 |
121 |
Renovate library interior, replace storm windows |
$200,000 |
Richfield Springs Public Library |
51 |
121 |
Replace tile flooring |
$10,000 |
Worcester Free Library |
51 |
102 |
Renovation of newly purchased facility |
$695,000 |
Unadilla Public Library |
51 |
122 |
Elevator/lift, air conditioners upgraded |
$60,000 |
|
Village Library of Morris |
51 |
122 |
Renovation of front porch, Major addition |
$1,000,000 |
System |
Library Name |
County |
Sen. Dist. |
Asy. Dist. |
Project Description |
Amount |
System Total |
Mid York Library System |
System Total |
$14,309,311 |
|
Frankfort Free Library |
Herkimer |
51 |
119 |
Exterior Projects:
Repair/ replace stucco on building; Replace concrete walkways leading to rear of building, on ramps and at front of property; Replace rear entry exterior door;
Add automatic door openers to front and rear doors; Replace exterior lighting
Interior:
Baseboard heating replaced in lower level; Automatic door entry to interior front door; Repair of front stairway to lower level; Wheelchair lift in rear; custom shelving under windows in children’s area; new carpeting throughout downstairs; replace wallpaper where leaks have occurred; paint conference and main downstairs rooms; repair wallboard and replace carpeting in the downstairs (water damage); chimney inspected; water fountain replaced |
$300,000 |
Ilion Free Public Library |
51 |
101 |
New roof; basement remodeling; convert staff space to public space; purchase property next door for expansion; foundation work; new electrical; new meeting room; re-point bricks; chimney repair; install energy efficient windows in addition; waterproof basement |
$664,200 |
Jordanville Public Library |
51 |
101 |
New roof; restoration of four columns that support the overhanging roof at the front of the library |
$50,000 |
Middleville Free Library |
49 |
118 |
Wheelchair accessible electronic door; new shelving to better utilize space used for library collections |
$25,000 |
Old Forge Library |
49 |
118 |
Pour concrete in the floor underneath the Judith Lowenstein Cohen Memorial wing to provide 1200 sq. ft. secure dry storage |
$15,600 |
Weller Library |
51 |
101 |
Re-plaster Children’s Room; restoration of bas relief floral ceiling plaster in Reading Room; masonry repair on vault; replace windows; energy efficient HVAC |
$120,000 |
Canastota Public Library |
Madison |
53 |
121 |
Remodel parking lot entrance with a new roof, automatic door, rubber stair treads, industrial carpeting, new lighting, window in elevator foyer, fresh paint $80,000
Repoint bricks $5,000
Replace roof $35,000
Repair parking lot, seal and stripe $5000
Interior painting $10,000
Paint exterior trim $10,000
Replace 3 furnaces $15,000
Replace 3 air conditioners $15,000 |
$175,000 |
Cazenovia Public Library |
53 |
121 |
Paint current building; addition |
$1,100,000 |
DeRuyter Free Library |
53 |
121 |
Install ‘green’ HVAC; install energy efficient windows; new flooring; new wiring; new public & staff restrooms; reconfiguring newly created library space |
$2,000,000 |
Hamilton Public library |
53 |
121 |
New heating system and fans; Insulating the second floor; Replacement windows in 1830 wing; |
$6,000 |
New Woodstock Free Library |
53 |
121 |
20 year project to: replace roofs; replace boilers; repaint interior & exterior; replace carpets, tile, & wood floors; repair & replace front entrance and foundation; replace and construct adequate parking space; replace basement windows; install additional insulation; reline the chimney; refinish wood floors |
$400,000 |
Oneida Public Library |
53 |
121 |
New state-of-the-art technology for new library; security system; parking lot; phase 2 of lighting |
$800,000 |
Sullivan Free Library-Bridgeport |
53 |
121 |
Addition; 2nd and 3rd phase of renovation |
$525,000 |
Sullivan Free Library-Chittenango |
53 |
121 |
replace HVAC; insulate building; weatherize windows; repave parking lot for improved accessibility and safety |
$125,000 |
C.W. Clark Memorial Library |
Oneida |
53 |
121 |
Parking improvements; convert basement into usable space; construction of a 1,100 sq. ft., 2 story addition to existing library; purchase of new shelving |
$403,008 |
Dunham Public Library |
47 |
119 |
2 story foyer to allow entrance from new parking lot; parking lot construction; Dunham house renovations: replacing basement furnace, insulation, updated electrical, paining exterior trim, build second floor ADA complaint bathroom and kitchenette, repair crumbling ceiling, create fire exit and shore up front entrance so first floor can be opened to patrons for meeting rooms; Children's room addition (3 phases) |
$1,300,000 |
Jervis Public Library |
47 |
119 |
Expanded Children’s Room & adjustable programming room ($1,500,000); construction of additional meeting room space ($800,000); Installation of a solar array ($200,000) |
$2,500,000 |
Mid-York Library System Headquarters |
47 |
116 |
Ongoing initiative to make facility “green” over the next 10 years, including solar panels for alternate energy source ($265,000); replace roof and insulate to further reduce operational cost ($465,000); create additional off street parking ($85,000); install backup generator ($35,000); redesign interior for work efficiencies ($350,000); upgrade conference center ($70,000) |
$2,540,000 |
Oriskany Public Library |
47 |
119 |
Replacing back door; new front entrance with electric handicapped door; energy efficiencies determined by NYSERDA tests; new carpeting |
$30,000 |
Utica Public Library |
47 |
119 |
Electrical work: increase outlets for computers, install exterior power,, photo sensitive lighting at entrances, lighting in front lawn to light building and flag; Exterior projects: clean and repoint exterior of building, pipe railing & concrete curb replacement on east side of building, Lit library signs at rear and front of building; Interior: refinish flooring in gallery and music room, replace wall covering in gallery, replace flooring on main floor - lobby, rear entrance, 1st stack, Furnishings - tables and chairs, gas inserts in fireplaces; Elevator; Children's Room and First Floor renovations |
$1,130,503 |
Waterville Public Library |
47 |
121 |
Correct drainage and repair cracked/heaved sidewalk at entrance; replace carpeting |
$70,000 |
Western Town Library |
47 |
118 |
Replace HVAC; insulate building; weatherize windows |
$30,000 |
System |
Library Name |
County |
Sen. Dist. |
Asy. Dist. |
Project Description |
Amount |
System Total |
Nassau Library System |
System Total |
$101,504,808 |
|
Baldwin Public Library |
Nassau |
9 |
21 |
Replace windows in original part of the library ($800,000); Renovate Children’s room to expand open space ($10,000); Expand and renovate YA area ($50,000); Re-purpose and renovate storage space into meeting rooms and staff space ($3,000,000); Upgrade security system ($25,000); Renovate interior space that currently contains stacks to accommodate small group and individual study, including furniture purchases ($30,000); Upgrade controls for HVAC system ($10,000); Solar panels for energy efficiency ($50,000) |
$3,975,000 |
Bayville Free Library |
5 |
13 |
Re-purpose attic that is currently used as storage space as programming and meeting space and renovate it plus install an elevator for ADA-compliant access and purchase initial furnishings. |
$250,000 |
Bellmore Memorial Library |
8 |
14 |
New energy-efficient HVAC ($350,000); Renovate quiet study areas including repaired walls, new lighting & windows and new furniture ($100,000); Install a sound-proof room divider in the community room ($12,000); Replace and relocate existing circ desk including relocation of power and data lines to all the implementation of RFID ($100,000) |
$562,000 |
Bethpage Public Library |
6 |
15 |
Replacement of upper roof ($250,000); renovation of auditorium including seats, carpeting and sound system ($200,000); create an outdoor garden/story space adjacent to the Children's Room ($50,000); replace chairs in the Reading Room ($12,000); replace and reconfigure computer desks ($10,000); reconfigure the interior space on the main floor and in the basement area to provide a maker-space and small conference rooms ($200,000); interior painting ($30,000). |
$752,000 |
East Meadow Public Library |
6 |
17 |
Redesign the bldg. entrance; Re-configure and renovate the interior to add small group study & meeting spaces & a theater, increase public seating, re-locate stacks to ensure ADA-compliance, increase exhibit space, create a makerspace & classroom, enhance the children’s room, create a family bathroom, improve staff work areas, and replace worn or damaged flooring & carpeting; Replace HVAC; Ameliorate the humidity problem; Replace windows & tint some for sun control; Replace elevator; New energy-efficient lighting; Upgrade electric panels and wiring; Add interior and exterior security cameras; Upgrade or replace alarm systems; Acquire and install a back-up generator; Replace underground oil storage tank with one that has a monitoring and alarm system; Re-configure the parking lot to add spaces & address safety issues, renovate lot to address drainage problems, and upgrade lighting; Replace an illuminated sign on the corner & add an exterior directional sign on the street entrance to the parking lot; Add a drive-up materials return; Add one sidewalk & restore existing ones; Enclose dumpster; Update lawn sprinkler system and add irrigation to areas that currently must be watered manually. |
$7,500,000 |
East Rockaway Public Library |
9 |
21 |
New handicap accessible entrance ramp & electric entrance doors ($100,000); Plumbing - replace pipes from bathrooms to traps ($80,000). |
$180,000 |
East Williston Public Library |
7 |
19 |
Construct an ADA-compliant rest room on the lower level adjacent to space where hold programs. |
$50,000 |
Farmingdale Public Library |
6 |
17 |
Replace 3 HVAC units with remote maintenance software ($300,000); Replace roof ($180,000); Renovate and update Children’s playroom including removing a platform; Replace worn carpeting and chairs. (Rough estimate for renovating children's playroom and replacing worn carpeting & chairs = $120,000) |
$600,000 |
Floral Park Public Library |
7 |
22 |
Construction of an elevator; new entrance ramp/plaza, and electronic doorway for wheelchair accessibility ($850,000); construction of dedicated teen space with walls, carpeting and doorway ($50,000); installation of smaller circulation desk and removal of existing desk with purpose of creating a Quiet Study Room in the space, including adding glass walls, doorway, carpeting. ($50,000). |
$950,000 |
Franklin Square Public Library |
6 |
19 |
Repurpose and renovate existing space to create a teen area ($55,000); New energy-efficient lighting ($52,000); New HVAC system ($150,000) |
$257,000 |
Freeport Memorial Library |
8 |
21 |
EAST BLDG: Renovate 6 bathrooms ($240,000); Renovate meeting rooms 1, 2, and 3, including new ceiling, lighting and replacement sound system & stage ($260,000); New ceiling and lighting for lower level -Tech. Services, Rooms 4 and 5 - ($287,000); Renovate room #6 ($100,000); Renovate staff room including kitchen cabinet replacement & wallpaper (no estimate). WEST BLDG: Replace boiler & remove oil tank ($350,000); Carpet replacement in lobby & vestibules ($8,000). BOTH BLDGS: Exterior restoration, re-pointing & painting ($275,000); Electronic LED exterior sign ($30,000); Replacement of phone system ($10,000); Renovation of staff parking area ($20,000); Re-landscaping ($50,000) |
$1,630,000 |
Garden City Public Library |
6 |
19 |
Replace roof ($700,000); Renovate children’s bathrooms ($33,000); Replace HVAC ($600,000); and restore masonry facade ($350,000) |
$1,683,000 |
Gold Coast Public Library |
5 |
19 |
There is general agreement about the need to provide additional space for the growth of the collection, as well the provision of meeting room space for community groups and library programs. This could mean expanding the present facility, building a new facility, or leasing and outfitting a second facility. Cost estimates vary depending on the option selected. |
$15,000,000 |
Great Neck Library |
7 |
16 |
Renovations related to RFID implementation in the Main Library and three branches |
$100,000 |
Hempstead Public Library |
6 |
18 |
Building Expansion and Renovations (15,000,000) Replace 3 Floors of Carpeting ($250,000); HVAC Replacements Energy Efficient (No Estimate) ($200,000); New Boiler (150,000); New Energy Efficient LED Lighting(No Estimate); Replace Reference Desk (No Estimates), Generator Backup Sump Pumps (No Estimate); Ceiling Replacement in Meeting Room (No Estimate); New Library Furniture |
$15,600,000 |
Hewlett-Woodmere Public Library |
9 |
20 |
Replace approx. 27,000 sq. ft. of roof ($275,000); Repair existing slate roof ($20,000); Energy-efficient lighting ($30,000); HVAC upgrade 8 units ($240,000); Renovate two restrooms ($69,000); Photovoltaic solar panels for 7,000 sq. ft. area ($160,000); Re-purposing and renovation of some internal space ($100,000); Replace carpeting ($115,000); Paint interior of library ($28,000); Renovations required for installation of a book sorting system ($50,000); |
$1,087,000 |
Hicksville Public Library |
6 |
15 |
Replace HVAC; Replace elevator; Replace roof; Renovate parking lot |
$600,000 |
Hillside Public Library |
7 |
19 |
Replace water-damaged sheetrock in the Children's and YA rooms and repaint the walls with new sheetrock ($18,000); Energy-efficient lighting in Children's and YA rooms ($8,000); Re-purpose a portion of the children's room to create study rooms $20,000) |
$46,000 |
Island Park Public Library |
9 |
20 |
Replace roof ($100,000); Replace 3 HVAC units ($75,000); New energy-efficient lighting ($75,000); Renovate parking ($40,000); Acquire and install new media projection system ($9,500) |
$299,500 |
Island Trees Public Library |
6 |
17 |
The library will be relocated in same building it is in currently in space renovated specifically for the library including a large meeting room which can be divided into two rooms as needed. The relocated library will have 33% more space than it currently has. A recent public vote authorized bonding for $7 million.. However, until construction drawings have been completed and the project is bid, it is not known if $7 million will be enough. Because of this, $200,000 is included on this list to cover any additional and/or unanticipated costs. |
$200,000 |
Jericho Public Library |
5 |
13 |
Renovate 10,000 sq. feet ($3,100,000); Replace windows ($75,000); Replace HVAC units with energy-efficient ones ($100,000); Renovate small, auxiliary parking lot ($25,000) |
$3,300,000 |
Levittown Public Library |
6 |
17 |
Renovate the community room – includes making it ADA compliant, replacing the ceiling, lighting, flooring and stage and requires asbestos abatement |
$160,000 |
Locust Valley Library |
5 |
15 |
Add 9 additional parking spaces in front lot and renovate driveways and other parking lot ($101,150); Replace roof ($95,000); Add full-service elevator ($100,000); Internal sprinkler system ($150,000); Replace wood retaining wall with masonry ($10,000); Replace lower level windows and replace grates at areaways with rails ($35,000); Replace HVAC units ($50,000); Replace building siding and trim ($55,000). Subtotal: $596,150 Re-configure and renovate lower level to expand story time corner, add a study room and co-working spaces, new carpet, paint, refresh restrooms; Re-configure and renovate main floor to create co-working spaces, new teen area, new meeting/conference room, new café and replace carpet, paint, refresh restroom; Re-configure and renovate third floor to expand staff work space, replace carpet, paint, and refresh restroom; Expand front deck to create outdoor reading area. Very rough estimate for all of the work in this paragraph = $600,000 |
$1,196,150 |
Long Beach Public Library |
9 |
20 |
Replace roof ($400,000); Upgrade/replace HVAC rooftop units ($150,000); Acquire generator and install on roof ($225,000); Renovate public restrooms ($85,000); Repurpose & renovate space to enhance teen area ($40,000); Replace front doors ($20,000); Add additional security cameras and enhanced monitoring ($10,000); New dropped ceiling and additional storage space in large meeting room ($20,000); Interior renovations to create meeting and tutoring room on 1st floor & create new storage space and for custodians ($60,000); expand solar panel array ($25,000+). |
$1,035,000 |
Lynbrook Public Library |
9 |
21 |
HVAC replacement and upgrade ($150,000); Rehabilitation of parking lot ($50,000); Add an awning over the exterior entrance to the lower floor to alleviate water getting into the building via this entrance and replace awning over the main entrance to the library with a larger one to shield patrons entering the building and make the automated doors less sensitive to rain and snow ($50.000?); Renovate all 4 restrooms – Women’s, Men’s, Children’s and A unisex, single-occupancy bathroom for individuals with disabilities and parents/caregivers with children ($225,000); New public services desks - Circulation, Children’s and Adult Reference ($128,000). |
$603,000 |
Manhasset Public Library |
7 |
16 |
Repurpose some interior space which will require renovations; Replace existing interior lighting with energy-efficient lighting; Renovate the parking lot; Construct of a new walkway to adjacent parking; Add more exterior lighting |
$450,000 |
Massapequa Public Library |
8 |
9 |
Bar Harbor building: Additional entrance to building from the parking lot; Re-configure and renovate portions of the building. Both Bar Harbor and Central Ave. buildings: Replace HVAC; Renovate parking lots; Add external security cameras; New energy-efficient lighting; Interior & exterior painting. |
$1,500,000 |
Merrick Library |
8 |
14 |
Renovate parking lot ($150,000); Replace carpeting throughout building ($100,000); Paint interior of library ($25,000); Remove large planter in garden to make room for outdoor programming ($20,000) |
$295,000 |
Nassau Library System |
|
|
Repair/repoint an exterior wall ($27,000); New front entrance with automatic doors ($30,000); Renovate and make fully ADA-compliant 3 restrooms ($90,000); Renovate a 4th bathroom ($24,000); Interior renovations to create a self-contained meeting room / training center 'wing' with public access when the rest of the building is closed ($960,000) |
$1,131,000 |
North Bellmore Public Library |
8 |
14 |
Major renovation of existing building with some expansion. Based on conceptual drawings and estimated costs a public vote authorized bonding for $8.9. However, until construction drawings have been completed and the project is bid, it is not known if $8.9 million will be enough. Because of this, $200,000 is included on this list to cover any additional and/or unanticipated costs. |
$200,000 |
North Merrick Public Library |
8 |
14 |
Replace original windows ($538,400); Replace boiler ($412,300); Construct porticos for front and rear entrances ($255,000); Solar lit entry sign for rear parking lot ($10,658); Reconstruct front parking lot ($64,550); Reconstruct rear parking lot ($64,550); Landscape and hardscape property ($50,000); Atrium reading room ($50,000); Create children’s program room ($90,000); Renovate community room ($75,000); Renovate children’s room ($50,000); Renovate reference room ($50,000); Renovate YA/teen area & stack area ($100,000); Renovate reading room ($40,000); Upgrade lighting ($60,000); Drop ceilings ($50,000); Renovate two restrooms ($60,000) |
$2,020,458 |
Oceanside Library |
9 |
20 |
Electrical/HVAC upgrade ($300,000); Renovate 4 bathrooms ($250,000); Replace elevator ($250,000); Energy-efficient LED lighting ($50,000); Solar panels on roof and roof repair necessitated by the installation of the solar panels ($50,000); Upgrade security system ($25,000); Digital signage ($15,000); Sidewalk replacement ($10,000); Interior re-purposing and renovation including teen space, makerspace, study rooms, and redesigned & modernized children’s room with programming space ($5,000,000)
|
$5,950,000 |
Oyster Bay-East Norwich Public Library |
5 |
13 |
Replace remaining single pane windows ($10,000); Paint interior ($6,000); Paint exterior ($7,000); Replace flooring and carpeting ($66,000) |
$89,000 |
Peninsula Public Library |
9 |
20 |
Construction of a new, expanded library at another location. |
$20,000,000 |
Plainedge Public Library |
6 |
17 |
Replace roof and roof windows ($700,000); Replace lower level HVAC unit and water tower ($40,000); Upgrade electric panel ($10,000); Re-surface parking lot ($7,000) |
$757,000 |
Plainview-Old Bethpage Public Library |
5 |
13 |
Renovate Reference Dpt. ($200,000); Replace roof $1,000,000); Demolition and reconstruction of the lower level including ADA-compliant restrooms and three meeting rooms ($600,000); Renovate front parking lot including improved drainage and new concrete curbing ($250,000) |
$2,050,000 |
Port Washington Public Library |
7 |
16 |
Children’s Library renovation ($1,500,000); Interior renovations and repurposing of existing space ($500,000); Carpeting ($80,000); Air conditioning system for meeting room ($40,000); Energy-efficient LED lighting ($125,000); Solar panels and sustainable energy upgrades ($300,000); HVAC cooling tower repair ($20,000) |
$2,565,000 |
Rockville Centre Public Library |
9 |
21 |
Window replacement ($134,000); Replace roof ($300,000); Renovate restrooms ($60,000); Restoration of exterior brick facade to eliminate moisture problem ($200,000); Add air curtain to rear entry ($40,000); Replace front entrance pavement ($5,000); New phone system ($20,000); Replace audio equipment in Community Room ($15,000); Sound abatement in study rooms ($10,000); Resurface the parking lot ($60,000); New furniture for adult area ($40,000); Replace carpeting on main level and 2nd floor ($75,000) |
$959,000 |
Roslyn (Bryant) Public Library |
7 |
13 |
Re-configure and renovate the main floor ($750,000); Construct and furnish a Makerspace ($200,000). |
$950,000 |
Sea Cliff Village Library |
5 |
13 |
Replace lighting ($35,000) and painting the inside of the library $15,000) |
$50,000 |
Seaford Public Library |
8 |
14 |
Renovate 2 sets restrooms ($125,000); Upgrade electrical system ($25,000); Window replacement ($125,000); Re-purpose & renovate 3rd floor space to create a meeting room and relocate the administrative offices ($25,000); Re-purpose and renovate current administrative offices on main floor of library for teen area, makerspace and tutoring space ($30,000) |
$330,000 |
Shelter Rock Public Library |
7 |
19 |
Construct and furnish two quiet study rooms |
$40,000 |
Syosset Public Library |
5 |
13 |
Replace roof over Children’s Library area EDPM roofing ($356,000); Additional lighting on the third and first floors ($115,000); Upgrade bathroom exhaust fans for ventilation ($ 40,000); Emergency generator ($300,000); Rooftop lightening protection system ($55,000); Renovate parking lot ($185,000); Add 10 interior & exterior CCTV security cameras ($50,000); Dehumidification system for Board Room ($40,000) |
$1,141,000 |
Uniondale Public Library |
6 |
18 |
Renovate 4 restrooms ($137,000); Replace existing lighting fixtures throughout the building with energy efficient lighting ($40,000); Replace carpeting throughout building ($100,000); Replace existing blinds ($25,000); Repaint entire interior of building ($20,000) |
$322,000 |
Valley Stream Public Library |
9 |
22 |
Repurpose existing space to create a Makerspace room with security camera ($22,500); Replace existing exterior steps at staff entrance with ADA-compliant ramp and new stairs with exterior security camera ($21,500); Repurpose existing space to create a public study room with study carrels with electrical outlets for computers and a security camera ($33,500) |
$77,500 |
Wantagh Public Library |
8 |
14 |
Replace large rooftop HVAC unit ($515,000); Replace room ($150,000); Replace clearstory windows ($220,000); Renovate bathrooms ($87,000); Replace exterior doors ($48,000) Electrical panel upgrade ($11,000); Replace water heater ($1,200); Replace public service desks ($85,000); Replace interior ceilings ($100,000?); Create children’s programming room ($60,000?) |
$1,277,200 |
West Hempstead Public Library |
9 |
21 |
Energy-efficient LED lighting ($500,000); Create a wall-enclosed outdoor story & play time space adjacent to the children’s room ($250,000?); Create a garden reading area ($150,000?) |
$900,000 |
Westbury Public Library |
7 |
13 |
Replace 5 HVAC units ($575,000); Solar panels ($100,000); Replace original 1966 windows ($80,000); Replace the two bathrooms in the Children's Library ($80,000). |
$835,000 |
System |
Library Name |
County |
Sen. Dist. |
Asy. Dist. |
Project Description |
Amount |
System Total |
The New York Public Library |
System Total |
$331,898,000 |
|
Allerton Branch |
Bronx |
36 |
80 |
New roof and windows; HVAC replacement |
$1,700,000 |
Baychester Branch |
36 |
82 |
ADA restrooms |
$500,000 |
Belmont Branch |
33 |
78 |
ADA restrooms; exterior renovation; HVAC replacement |
$3,000,000 |
Castle Hill Branch |
34 |
87 |
Exterior rehabilitation |
$1,500,000 |
Clason's Point Branch |
32 |
85 |
Supplemental budget request (existing projects) |
$613,000 |
Eastchester Branch |
36 |
83 |
ADA entrance and restrooms |
$1,000,000 |
Edenwald Branch |
36 |
83 |
Supplemental budget request (existing project) |
$100,000 |
Francis Martin Branch |
33 |
86 |
ADA restrooms and elevator; supplemental budget request (existing project) ($300,000) |
$2,300,000 |
Grand Concourse Branch |
33 |
86 |
New roof |
$600,000 |
Morris Park Branch |
34 |
80 |
ADA entrance |
$500,000 |
Morrisania Branch |
32 |
79 |
ADA elevator; new boiler; electrical upgrades; supplemental budget request (existing project) ($200,000) |
$2,425,000 |
Mosholu Branch |
36 |
80 |
Ejector pump; supplemental budget request (existing projects) ($700,000) |
$800,000 |
Mott Haven Branch |
29 |
84 |
Supplemental budget request (existing project) |
$500,000 |
Parkchester Branch |
32 |
87 |
New ADA compliant elevator; new boiler and HVAC systems |
$2,425,000 |
Pelham Bay Branch |
34 |
82 |
ADA restrooms; new roof |
$1,300,000 |
Pelham Parkway-Van Nest Branch |
34 |
80 |
ADA restrooms; new roof |
$1,300,000 |
Riverdale Branch |
34 |
81 |
ADA restrooms; HVAC upgrades; supplemental budget request (existing project) ($1,000,000) |
$2,500,000 |
Spuyten Duyvil Branch |
34 |
81 |
Boiler and HVAC upgrades |
$1,000,000 |
Throg's Neck Branch |
34 |
82 |
Supplemental budget request (existing project) |
$200,000 |
Tremont Branch |
33 |
86 |
ADA elevator |
$725,000 |
West Farms Branch |
32 |
87 |
ADA restrooms; new roof |
$1,500,000 |
Westchester Square Branch |
32 |
82 |
Supplemental budget request (existing project) |
$3,000,000 |
Woodstock Branch |
32 |
79 |
New roof; supplemental budget request (existing project) ($2,000,000) |
$3,000,000 |
115th Street |
New York |
30 |
70 |
Supplemental budget request (existing project) ($500,000) |
$500,000 |
58th Street |
28 |
73 |
New ADA compliant elevator |
$1,000,000 |
67th Street |
28 |
76 |
Façade and window restoration; full HVAC upgrade and new boiler |
$2,800,000 |
96th Street |
28 |
68 |
Supplemental budget request (existing project) |
$100,000 |
Aguilar Branch |
29 |
68 |
Window restoration |
$1,500,000 |
Andrew Heiskell Braille & Talking Book Library |
28 |
75 |
Boiler and HVAC upgrades |
$2,500,000 |
Chatham Square Branch |
26 |
65 |
Exterior rehabilitation (windows and façade); boiler upgrades |
$3,400,000 |
Columbus Branch |
27 |
75 |
New roof; parapet wall restoration; sound barrier |
$800,000 |
Countee Cullen Branch |
30 |
70 |
Supplemental budget request (existing projects) |
$2,850,000 |
Epiphany Branch |
28 |
74 |
Supplemental budget request (existing project) |
$2,000,000 |
George Bruce Branch |
30 |
69 |
Boiler and heating distribution; supplemental budget request (existing project) ($1,000,000) |
$1,400,000 |
Hamilton Fish Park Branch |
26 |
74 |
Cooling tower and related work; supplemental budget request (existing project) ($1,000,000) |
$3,000,000 |
Hamilton Grange Branch |
31 |
71 |
Supplemental budget request (existing projects) |
$1,960,000 |
Harlem Branch |
30 |
70 |
New roof; fire alarm upgrades |
$850,000 |
Hudson Park Branch |
27 |
66 |
Supplemental budget request (existing project) |
$3,000,000 |
Midtown Campus |
27 |
75 |
Midtown Campus project |
$2,500,000 |
Muhlenberg Branch |
27 |
75 |
HVAC upgrades; heating and boiler distribution |
$900,000 |
Schomburg Center for Research in Black Culture |
30 |
70 |
ADA upgrades |
$1,500,000 |
Seward Park Branch |
26 |
65 |
New windows |
$1,500,000 |
Stephen A. Schwarzman Building |
27 |
75 |
Supplemental budget request (existing project) |
$14,800,000 |
Tompkins Square Branch |
27 |
74 |
Façade restoration; HVAC upgrades |
$3,000,000 |
Washington Heights Branch |
30 |
72 |
Façade restoration |
$3,000,000 |
Webster Branch |
28 |
76 |
Façade restoration; HVAC upgrades; electrical upgrades |
$3,100,000 |
Yorkville Branch |
28 |
73 |
New ADA compliant elevator; façade restoration; HVAC and electrical upgrades |
$6,100,000 |
Great Kills Branch |
Richmond |
24 |
62 |
ADA restrooms; façade and roof restoration; HVAC upgrades |
$3,100,000 |
Hugenot Park Branch |
24 |
62 |
ADA elevator; restoration of façade and windows; electrical upgrades |
$2,050,000 |
New Dorp Branch |
24 |
64 |
HVAC upgrades |
$600,000 |
Richmond Town Branch |
24 |
62 |
New windows; HVAC and boiler upgrades |
$2,800,000 |
St. George Library |
23 |
61 |
Supplemental budget request (existing project) |
$1,000,000 |
Tottenville Branch |
24 |
62 |
ADA elevator and associated electrical upgrades; new slate roof, windows, and site work; HVAC distribution and duct work |
$4,300,000 |
West New Brighton Branch |
23 |
61 |
ADA elevator replacement; HVAC and boiler upgrades |
$1,500,000 |
NYPL System-wide |
|
Various |
Various |
Critical system-wide maintenance (building preservation, ADA upgrades, life safety/security upgrades, mechanical systems/energy conservation) |
$220,000,000 |
System |
Library Name |
County |
Sen. Dist. |
Asy. Dist. |
Project Description |
Amount |
System Total |
Nioga Library System |
System Total |
$3,159,000 |
|
Batavia - Richmond Memorial Library |
Genesee |
61 |
139 |
Asbestos removal from basement work and break rooms - $50K,
ADA compliant ramp from the 2 ADA parking spaces down to the adjacent/overflow parking lot - $50K, Interior paint job (last painted 20 yrs. ago) - $40K, Landscaping (lost some popular trees when ADA parking was put in) - $25K |
$195,000 |
Byron-Bergen Free Library |
61 |
139 |
additional money to finish driveway project |
$15,000 |
Corfu Free Library |
61 |
139 |
replace lighting fixtures with energy efficient ones, new windows that are energy efficient, a handicap accessible entrance door with a button to open it |
$45,000 |
LeRoy - Woodward Memorial Library |
61 |
139 |
redo flooring and ceiling in downstairs level. Also add "acoustic ceiling clouds" in children's area |
$35,000 |
Oakfield - Haxton Memorial Library |
61 |
139 |
second bathroom in children's area (basement) - $25K, elevator to basement - $50K (only accessible by stairs) |
$85,000 |
Pavilion Public Library |
61 |
139 |
Add on a patio on the side of the building - $6K, continue upgrading outside of building - $5K |
$35,000 |
Barker Public Library |
Niagara |
62 |
144 |
Insulation in ceiling (entire building) |
$35,000 |
Lewiston Public Library |
62 |
145 |
replace an existing HVAC condensing unit. Due to size of new unit, it will need to be placed in a different location |
$55,000 |
Lockport Public Library |
62 |
144 |
repairs to the elevator, replace windows (custom made), 10K for each project |
$40,000 |
Middleport Public Library |
62 |
144 |
Put up a permanent building sign out front - $2K, Repairing/replacing the handicapped ramp - $3K, Pouring a concrete slab out front of the building - $1K, Restoring and repainting and moving sculpture to new slab - $500, Replacing ballasts and bulbs with LED per Lime/National Grid quote: $3K, Stretching the 30 year-old carpet - $1500 or even better replacing the carpet - $8K, Teen seating area - $3K, Play nook and refurbishment of the Children's Area - $3.5K, Putting solar panels on the roof - $10K, Installing an elevator - $10K, Build a sunroom on the side of the building for quiet area - $12K |
$95,000 |
Newfane Free Library |
62 |
144 |
New walkways |
$15,000 |
Niagara Falls Public Library - Main St. building |
62 |
145 |
Priority - add a handicap accessible restroom on first floor Second - remodel existing restrooms on first floor Also replacement of entire first floor concrete, replacement of exterior windows |
$1,500,000 |
Niagara Falls Public Library - LaSalle Branch |
62 |
145 |
renovate public restrooms (estimate: $7,000-10,000) |
$7,000 |
North Tonawanda Public Library |
62 |
140 |
would like to make existing facilities more handicap accessible - $100K, renovations needed to install emergency exit door in courtyard including a gate and possibly sidewalk leading to door - $5K (city will do some of the work but not all that is needed) |
$150,000 |
Ransomville Free Library |
62 |
144 |
possibly a new electronic sign for out front, will discuss this with their board |
$45,000 |
Sanborn - Pekin Free Library |
62 |
145 |
renovate public restrooms (estimate: $7,000-10,000) |
$29,000 |
Wilson Free Library |
62 |
144 |
repaint interior of library - $10,000 and redo siding on outside of entire building - $50,000 |
$80,000 |
Youngstown Free Library |
62 |
144 |
Repaint interior of building, reorganize interior of building |
$35,000 |
Albion - Swan Library |
Orleans |
62 |
139 |
redo floors in meeting room, also electronic sign |
$75,000 |
Holley - Community Free Library |
62 |
129 |
mold abatement in library and install cement floors in both basements (2) |
$140,000 |
Lyndonville - Yates Community Free Library |
62 |
139 |
expand workroom and community meeting space (is currently shared space) - may require small addition to library |
$235,000 |
Medina - Lee Whedon Memorial Library |
62 |
144 |
driveway/parking lot maintenance needed $3K, speaker system for building - program area - $2K |
$10,000 |
Nioga Library System |
|
|
|
New storage/vehicle garage - $75K, retrofit meeting room (paint, new carpet, lighting, sound/video system) - $65K, exterior masonry repairs - $25K, remodel youth services office (new librarian's office, new carpet, new lighting) - $38K |
$203,000 |
System |
Library Name |
County |
Sen. Dist. |
Asy. Dist. |
Project Description |
Amount |
System Total |
North Country Library System |
System Total |
$11,983,552 |
|
Adams Free Library |
Jefferson |
48 |
117 |
New building |
$200,000 |
Bodman Memorial Library (PHI) |
48 |
116 |
Retool foundation ; Waterproof basement ; New eves and soffit ; New front entrance ; Convert attic into usable space (insulation, sheetrock, wiring, heating) ; fill and level backyard to address drainage issues ; Library addition ; reconstruction of 1st floor of library (New ceiling, flooring, wiring, lighting, windows, insulation, sheetrock, furniture) ; Fencing around library property |
$200,000 |
Brownville Glen Park Library |
48 |
116 |
Handicap accessible entrance |
$10,000 |
Cape Vincent Community Library |
48 |
116 |
Addition for a meeting room |
$200,000 |
Carthage Free Library |
48 |
117 |
Land acquisition for new parking lot |
$70,000 |
Crosby Public Library (ANT) |
48 |
116 |
Phase III of library addition (Masonry, Roofing, insulation, interior construction) |
$161,422 |
Depauville Free Library |
48 |
116 |
Roof ; Improvements to handicap accessibility ; Signage ; Outdoor Lighting ; Boiler |
$77,000 |
Dexter Free Library |
48 |
116 |
Paved 50 ft. driveway; 12 vehicle parking lot; new carpets; new furniture |
$80,000 |
East Hounsfield Free Library |
48 |
116 |
New siding; wheelchair ramp; renovations to make all areas of the library accessible to patrons in wheelchairs (including ramps, elevator/lift, and restroom); meeting/reading room |
$147,000 |
Hawn Memorial Library (CLA) |
48 |
116 |
Install a second bathroom; new roof (or lean-to awning); restructure basement for community room |
$35,000 |
Hay Memorial Library (SAH) |
48 |
116 |
New roof & gutters |
$40,000 |
Henderson Free Library |
48 |
117 |
New building |
$500,000 |
Lyme Free Library (CHA) |
48 |
116 |
Heating system upgrade ; Address leakage issues |
$30,000 |
North Country Library System |
48 |
124 |
Expand garage; Fiber network project |
$878,350 |
Philomathean Free Library (BEL) |
48 |
120 |
New roof on main building; handicap ramp and bathroom; new lighting and electrical; new roof and reconstruction of existing storage area; new carpeting throughout library |
$50,000 |
Roswell P. Flower Memorial Library |
48 |
116 |
Exterior fire-rated doors, Energy efficient windows, Heating and cooling system, replace carpeting, replace lighting with energy efficient lighting |
$302,430 |
Sally Ploof Hunter Memorial Library (BLR) |
48 |
117 |
Addition for meeting room |
$200,000 |
Theresa Free Library |
48 |
116 |
Masonry (Repointing of library building) |
$30,000 |
Constableville Village Library |
Lewis |
47 |
117 |
Renovations to make all areas of the library accessible to patrons in wheelchairs; renovation of the attic to house historical materials collection and provide meeting area; renovations to exterior of the library |
$30,000 |
Croghan Free Library |
47 |
117 |
New carpeting; Replace exterior handicap deck and entryway ; New doors ; Update lighting ; Install lift chair ; Revamp wing/storage area for usable space ; upgrade electrical ; reconstruct library space and upgrade bookcases, seating, and signage |
$145,000 |
Harrisville Free Library |
47 |
117 |
Renovate basement into usable library space |
$20,000 |
Lowville Free Library |
47 |
117 |
Tuck-point brick exterior; painting trim and doors; new windows; replace roof; new steps; water drainage issues |
$110,000 |
Lyons Fall Library |
47 |
117 |
Plans to convert a room at the library to create a music library. Grant will be used to add shelving and climatize the room to properly archive the collection |
$15,000 |
Osceola Public Library |
47 |
117 |
Upgraded water and septic system ; handicap accessible bathroom |
$53,800 |
Port Leydon Community Library |
47 |
117 |
Addition |
$150,000 |
William H. Bush Memorial Library (MAR) |
47 |
117 |
Sidewalk repairs; outdoor lighting with photo eye ; furnace/heating upgrades (conversion to propane) ; septic system upgrade ; library shelving and cabinets |
$200,000 |
Annie P. Ainsworth Memorial Library (SCR) |
Oswego |
48 |
120 |
Install hardwood floors, expand parking lot, drainage issues |
$125,000 |
Central Square Library |
48 |
120 |
New ceiling ; New flooring ; Restructure of library space ; Signage ; Repave parking lot |
$75,000 |
Cogswell Free Library (ORW) |
48 |
120 |
New carpet; new windows ; Lighting upgrades and reconstruction of library space |
$60,000 |
Fulton Public Library |
48 |
120 |
Chimney rehabilitation ; replacement/rehabilitation of historic doors and windows ; addition ; new flooring; converting attic into usable space ; electrical upgrade ; excavate front of building to address leakage issues ; Computer Room renovations ; increase library accessibility; roof |
$2,000,000 |
Hannibal Free Library |
48 |
120 |
Central air with dehumidifier; renovations of interior to convert storage space into Genealogy Center; addition or expand library into other side of building; new windows and doors; parking |
$600,000 |
Mexico Public Library |
48 |
120 |
Renovations to the Community Room including a small kitchen and new technology; new furniture for community room ; additional space for public access computers, second bathroom/handicap bathroom, handicap ramp to empty 2nd floor space; renovation of empty 2nd floor space. |
$500,000 |
Oswego School District Public Library |
48 |
120 |
Rehabilitate windows ; Repoint foundation |
$71,550 |
Phoenix Public Library |
48 |
120 |
Furnace and central air conditioning ; fire alarm and gas detection system ; new carpeting and flooring, replacement of stucco and additional insulation ; wiring for fiber optics; Purchase of land behind library for a nature area with a story circle |
$80,000 |
Canton Free Library |
St. Lawrence |
48 |
116 |
Land acquisition and new building for program annex; wiring for upgrade to broadband internet; energy efficient lighting; solar panels |
$290,000 |
Hammond Free Library |
48 |
116 |
Extensive renovations to basement of existing library to make space usable; replacement of roof; construction of exterior ramp to comply with ADA specifications; replacement of hot water heater |
$90,000 |
Hepburn Library of Colton |
45 |
118 |
Restoring columns; restoring upstairs bathroom; addition |
$197,000 |
Hepburn Library of Edwards |
48 |
117 |
Renovations to make all areas of the library accessible to patrons in wheelchairs (including restroom) |
$100,000 |
Hepburn Library of Lisbon |
48 |
116 |
Energy efficient windows; Replace doors; new carpeting and flooring; replace furnace/boiler, Renovations to parking lot |
$119,000 |
Hepburn Library of Madrid |
48 |
118 |
Renovate basement into a community room/resource center ; replace front steps ; new carpeting |
$286,000 |
Hepburn Library of Norfolk |
47 |
118 |
Renovating downstairs of library to make into usable shelving area/learning center and meeting room with efficiency kitchen; restructuring new space upstairs into a Reading Center/Coffee Center |
$85,000 |
Hepburn Library of Waddington |
48 |
116 |
Upgrades to air conditioning system; replace radiators with baseboard heat; updating library interior; handicap accessible bathroom upstairs; additional bathroom downstairs; convert attic into usable space |
$175,000 |
Heuvelton Free Library |
48 |
116 |
New building (to allow for handicap accessibility) |
$1,000,000 |
Hopkinton Reading Center |
47 |
122 |
New building |
$150,000 |
Massena Public Library |
47 |
116 |
Construct a "makerspace" room ; replace elevator ; replace handicap accessible doors on side of library |
$150,000 |
Morley Library |
47 |
118 |
Complete historic restoration or new building |
$200,000 |
Morristown Public Library |
48 |
116 |
Increase library space (1,000 square foot library addition and convert the existing attic into usable library space with a kitchen) |
$350,000 |
Ogdensburg Public Library |
48 |
116 |
Addition for increased library space ; handicap accessible restroom on the main floor; renovations to make every area of the library accessible to all patrons; reconstruction of stacks area to allow for Makerspace/Museum/Coffee shop ; parking improvements ; improvements to library auditorium ; replacement of carpets and ceilings |
$1,000,000 |
Potsdam Public Library |
47 |
116 |
Installation of elevator in existing elevator shaft and additional floor stops; renovations to install ramps; walkways; fire doors; walls to provide access to the 2nd and 3rd floors of the library |
$200,000 |
Rensselaer Falls Library |
48 |
117 |
Addition on rear of library; wiring for upgrade to broadband; add public bathroom |
$45,000 |
Richville Free Library |
48 |
117 |
Solar heat for addition; new porch; new exit |
$100,000 |
System |
Library Name |
County |
Sen. Dist. |
Asy. Dist. |
Project Description |
Amount |
System Total |
Pioneer Library System |
System Total |
$38,044,500 |
|
Avon Free Library |
Livingston |
59 |
133 |
Renovate the old kitchen into a workroom; improved lighting |
$300,000 |
Bell Memorial Library |
57 |
133 |
New furnace; blacktop for parking lot; replace basement windows |
$32,000 |
Caledonia Library Association |
59 |
133 |
Addition (includes additional meeting space, additional space for public access computers); new wiring for electrical equipment & telecommunications; renovations to make all areas of the library accessible to patrons in wheelchairs (including restroom) |
$500,000 |
Dansville Public Library |
57 |
133 |
Electrical upgrades; renovations & accessibility improvements to Shepard building’s secondary entry; renovations to Shepard building main entry |
$150,000 |
Lima Public Library |
59 |
133 |
Front doors; front building overhang; new windows; carpeting; electrical upgrades; insulation |
$130,000 |
Livonia Public Library |
57 |
133 |
New addition to current facility to include children’s center, multi-use community room, and teen/technology zone; installation of energy efficient windows; upgraded HVAC system, electrical, and lighting in existing building; renovation of current facility to be fully ADA compliant |
$2,500,000 |
Mount Morris Library |
57 |
133 |
Parking lot; new entry; fully-accessible restrooms |
$65,000 |
Lima Public Library |
59 |
233 |
Roof replacement |
$45,000 |
Wadsworth Library |
59 |
233 |
Complete original 1995 addition by adding a second floor and installing an elevator; energy efficiency; roof replacement; expansion |
$1,950,000 |
Allens Hill Free Library |
Ontario |
55 |
131 |
Addition & renovations to be made to existing building: Meeting Room; storage room; YA area; new roof; new flooring; storage shed outside; more shelving; modernize interior; additional lighting |
$200,000 |
Bloomfield Public Library |
55 |
131 |
Install ramp or curb cut to sidewalk to improve accessibility from handicapped parking spaces; improve parking lot by paving, lining, and adding additional handicap parking; new roof; additional space for public access computers; replace carpeting; upgrade HVAC. Interior redesign - Add counters, space rearranging painting and carpet/paint. |
$155,000 |
Bristol Library |
55 |
131 |
Renovation project to include: new carpeting throughout; replacement siding; improved space for public internet computers and for circulation area; parking lot repairs |
$27,500 |
Clifton Springs Library |
54 |
131 |
Replace carpeting; refit 2 bathrooms with handicapped accessible facilities |
$20,000 |
Geneva Public Library |
54 |
131 |
Cooling tower; café and reading room construction; energy audit & HVAC upgrades; heat pump replacements (may be annual need); storm windows; interior & exterior painting; entrance renovations; bathroom addition; carpet replacement; addition of mobile branch (bookmobile); parking lot expansion; main floor renovation; lighting and new roof |
$2,000,000 |
Gorham Free Library |
54 |
131 |
Addition/renovations |
$500,000 |
Honeoye Public Library |
55 |
131 |
Parking lot improvements; accessible entry doors |
$55,000 |
Naples Library |
55 |
131 |
Paint interior; replace carpeting |
$50,000 |
Phelps Community Memorial Library |
54 |
131 |
Update 1950s plumbing & fixtures; renovate boiler room to library space; replace flooring in existing library space; expand reading area/outdoor space the length of the library. |
$306,000 |
Red Jacket Community Library |
54 |
131 |
Purchase of a new facility (commercial real estate) and furnishings or possible expansion of existing space |
$5,000,000 |
Victor Free Library |
55 |
131 |
Replace HVAC to increase energy efficiency & distribution; upgrade lighting; replace fixtures; improve ventilation; improve lighting in restrooms (2); replacement (upgrade quality) of main 4’’ pipes for fire protection system |
$5,000,000 |
Wood Library Association |
54 |
131 |
Ongoing renovations & expansion projects |
$3,000,000 |
Clyde-Savannah Public Library |
Wayne |
54 |
130 |
Lighting redone to be energy efficient; new doors installed with handicapped “button” for automatic opening; new carpeting; parking lot resurfacing and stripping; possible new roof; new chairs for computer stations |
$50,000 |
Lyons Public Library |
54 |
130 |
Partial renovation of basement into extra meeting rooms and public bathrooms |
$500,000 |
Macedon Public Library |
54 |
130 |
Putting an addition onto the present facility; renovating current library space |
$600,000 |
Marion Public Library |
54 |
130 |
New outdoor lighting; additional space for public access computers |
$20,000 |
Newark Public Library |
54 |
130 |
Renovation; accessibility |
$500,000 |
Ontario Public Library |
54 |
130 |
New facility |
$5,000,000 |
Palmyra Community Library |
54 |
130 |
Ongoing renovations to unfinished areas of the new building |
$2,000,000 |
Red Creek Free Library |
54 |
130 |
Add space by renovating the 2nd floor (new drop ceiling; drywall; new floor; heating & air conditioning ductwork; updated electrical for both lighting & computers; new bathroom fixtures); renovate existing kitchen; install lift of some type to make the 2nd floor accessible; make necessary repairs to leaking roof above library |
$150,000 |
Rose Free Library |
54 |
130 |
Renovations to make all areas of the library accessible to patrons in wheelchairs |
$60,000 |
Sodus Free Library |
54 |
130 |
Ongoing renovations to expanded space and connector building |
$500,000 |
Walworth-Seely Public Library |
54 |
130 |
New building |
$4,500,000 |
Williamson Free Public Library |
54 |
130 |
Drop ceiling for improved energy efficiency; better lighting; noise reduction |
$75,000 |
Wolcott Civic Free Library |
54 |
130 |
Parking lot improvements including designated handicapped parking spots |
$25,000 |
Arcade Free Library |
Wyoming |
59 |
147 |
Need to upgrade/move handicap accessible entrance |
$50,000 |
Cordelia A. Greene Library |
59 |
147 |
New roof |
$20,000 |
Eagle Free Library |
59 |
147 |
Interior renovations; roof |
$50,000 |
Perry Public Library |
59 |
147 |
Additions & renovations to the current building |
$900,000 |
Pike Library |
59 |
147 |
HVAC; new roof |
$45,000 |
|
Stevens Memorial Community Library |
59 |
147 |
Update handicapped ramp & entrance at the rear of the library which will become main entrance off the parking lot and meet ADA standards; close present. Move circulation desk with new books, magazines, and DVDs to rear entrance; opening adult shelving to be handicapped accessible; create new storage entrance 80 feet along the driveway; new porch and roof structure for access at the front of building. |
$700,000 |
|
Town of Gainesville Public Library |
59 |
147 |
New lighting |
$14,000 |
|
|
Warsaw Public Library |
59 |
147 |
Automatic doors, repair historic windows, roof replacement, elevator upgrade, boiler upgrade. |
$100,000 |
|
|
Wyoming Free Circulating Library Association |
59 |
147 |
Replace all of the siding on the building & replace rotting boards underneath and around the foundation; add a community room with a kitchen for teen & adult programs; new shelving; new carpeting in whole library (current carpeting is 15 years old); replace main room ceiling lighting; reface inside walls; interior painting; install a security system; upgrade handicapped accessible ramp and entrance to include an automatic opening door |
$200,000 |
|
System |
Library Name |
County |
Sen. Dist. |
Asy. Dist. |
Project Description |
Amount |
System Total |
Ramapo-Catskill Library System |
System Total |
$110,817,563
|
|
Chester Public Library |
Orange |
39 |
99 |
Replace roof; replace HVAC system and other energy efficient upgrades |
$300,000 |
Albert Wisner Public Library |
42 |
98 |
Expanding the parking lot; building an outdoor performance area and creating a path to connect the library to the adjacent park |
$371,600 |
Cornwall Public Library |
39 |
99 |
Addition to existing building; upgrades of mechanical systems; renovations of existing space |
$1,700,000 |
Florida Public Library |
42 |
98 |
Expansion/addition |
$250,000 |
Goshen Public Library and Historical Society |
42 |
99 |
New building |
$10,000,000 |
Greenwood Lake Public Library |
42 |
98 |
Redesign and replace roof add solar panels |
$200,000 |
Highland Falls Library |
39 |
99 |
Renovation of basement; addition of basement level furnace; and construction of a meeting room. |
$78,000 |
Josephine – Louise Public Library |
39 |
101 |
Renovation of balcony area to meet current safety standards; redesign of Children's service desk and improving of handicap accessibility, upgrade and replace old wiring and lighting. |
$60,000 |
Moffat Library of Washingtonville |
42 |
99 |
Renovation & restoration of historic landmark property; renovations of Library Carriage house building; emergency generator for main building |
$8,080,000 |
Newburgh Free Library |
39 |
104 |
Renovation |
$10,000,000 |
Pine Bush Area Public Library |
39 |
101 |
Build 6,000 sq. ft. addition |
$1,200,000 |
Port Jervis Free Library |
42 |
98 |
Replace custom-fabricated ornate cornice; interior renovations; replace windows; restore brick façade on East and South side of library; install new sprinkler system |
$1,250,000 |
Thrall Public Library District of Middletown and Wallkill |
42 |
100 |
20,000 sq. ft. addition; parking lot expansion |
$9,000,000 |
Tuxedo Park Library |
42 |
98 |
Replace HVAC system |
$100,000 |
Finkelstein Memorial Library |
Rockland |
38 |
97 |
Renovate 2nd & 3rd floors; Renovate Public Restrooms; Obtain space for a satellite location; Replace Public Elevator; Replace HVAC; Retro-fit existing 2nd building on property for enrichment center |
$10,000,000 |
Nanuet Public Library |
38 |
96 |
Demolition of existing building; construction of new state of the art, energy efficient, 40,000 sq. ft. building |
$19,500,000 |
New City Free Library |
38 |
96 |
Expansion/addition and renovation; renovations to lobby including replacement of flooring and lighting; replace all windows for energy efficient windows; new front entrance steps and handicap ramp; extensive renovations to meeting room including “green” lighting system; parking expansion. |
$12,000,000 |
Nyack Library |
38 |
97 |
Replacement of the roof on the old part of the building |
$75,000 |
Rose Memorial Library Association |
39 |
99 |
New building |
$14,100,000 |
Suffern Free Library |
38 |
97 |
Re-caulking the building windows and EIFS seams; replace carpeting; repair stone wall along Rt. 59; replace exterior ground lighting with energy efficient fixtures |
$442,000 |
Tomkins Cove Public Library |
39 |
99 |
Replace windows; install elevator for handicap accessibility; reconfigure parking lot; renovate auditorium and add AV equipment |
$450,000 |
Valley Cottage Free Library |
38 |
96 |
Replace boiler; replace skylights; remove two restrooms |
$130,000 |
West Nyack Free Library |
38 |
96 |
Expanding parking lot; regrading property; replacing the roof and replacing the sprinkler system |
$1,500,000 |
Daniel Pierce Library |
Sullivan |
42 |
101 |
Renovation of original 1902 building; construction of overhead protection for handicapped entrance to new addition; installation of outdoor building lights; paving 20,200 sq. ft. parking lot; parking lot lighting and outside safety features; installation of interior handicapped lift |
$658,863 |
Liberty Public Library |
42 |
100 |
Renovation and addition |
$2,500,000 |
Livingston Manor Library |
42 |
100 |
Repair front steps; replace HVAC; add solar panels |
$19,600 |
Western Sullivan Public Library |
42 |
100 |
Work on 3 buildings including ADA compliant doors; reconfiguration of service desks; reconfiguring parking lot; reconfiguration of public services areas and carpeting; new energy efficient lighting |
$352,500 |
Wallkill Public Library |
Ulster |
42 |
101 |
Construction of new state of the art, energy efficient, 8,700 sq. ft. addition to existing library building |
$6,500,000 |
System |
Library Name |
County |
Sen. Dist. |
Asy. Dist. |
Project Description |
Amount |
System Total |
Upper Hudson Library System |
System Total |
$41,334,000 |
|
Albany Public Library - Washington Ave branch |
Albany |
44 |
109 |
accessibility upgrades for both entrances, renovation of auditorium, redesign of 1st floor public space, front façade renovation, solar energy installation, design/build a parking facility for the library |
$9,180,000 |
APL - Arbor Hill branch |
44 |
108 |
new teen space enclosure, solar energy installation |
$45,000 |
APL - John J. Bach branch |
44 |
109 |
new addition for ys space, solar energy installation |
$1,020,000 |
APL - Pine Hills branch |
44 |
109 |
foundation repairs, front façade work, solar energy installation |
$175,000 |
APL - Howe branch |
44 |
108 |
foundation repairs, roof brick work, solar energy installation |
$395,000 |
APL - Delaware branch |
44 |
108 |
new teen space enclosure, removal of driveway roof, window replacement for energy efficiency, solar energy installation |
$155,000 |
Berne Public Library |
46 |
111 |
new roof, new well and plumbing |
$95,000 |
Bethlehem Public Library |
44 |
109 |
HVAC system replacement including control systems, safety alarm replacement (fire, security, building access), asbestos abatement, expand library program space using outdoor area adjacent to the building. |
$1,700,000 |
Cohoes Public Library |
44 |
108 |
Continue efforts to renovate and upgrade existing facility to 21st century library service standards OR relocate the library to a new site and build a new facility or renovate an existing facility to become the new library for Cohoes. |
$3,000,000 |
Guilderland Public Library |
46 |
109 |
new roof, new HVAC system and controls, ceiling insulation project, concrete slab floor replacement, redesign of main public space, restroom renovation for accessibility and energy efficiency, redesign of service desk space, design/build a coffee shop space in the library, design/build and addition to the building for more public space |
$7,264,000 |
RCS Community Library |
46 |
102 |
Interior air quality remediation, construction of additional library space using soon to be acquired additional space in the building, installation of a generator to become an emergency shelter |
$160,000 |
Rensselaerville Public Library |
46 |
102 |
Renovation/rehabilitation projects in existing library building - alarm system, hvac, floor leveling/stabilization, design/installation of an elevator, outdoor foundation retaining wall work, design and construction of an outdoor reading room and program space on the library property. |
$1,000,000 |
Town of Westerlo Public Library |
46 |
102 |
building insulation project, electrical system/lighting replacement project, acquire adjacent land for parking expansion, parking lot paving |
$150,000 |
Voorheesville Public Library |
46 |
109 |
window improvements, enhance bldg insulation, interior space redesign, public technology upgrades, electronic outdoor signage, solar energy installation, bldg addition for new ys space and study rooms |
$4,000,000 |
Wm. K. Sanford Public Library |
44 |
110 |
new roof, interior upgrades, restroom renovation and accessibility project, interior and exterior lighting upgrades, electrical system upgrades |
$500,000 |
Brunswick Community Library |
Rensselaer |
43 |
107 |
new electronic outdoor sign system |
$20,000 |
Arvilla E. Diver Memorial Library (Schaghticoke) |
43 |
107 |
Building insulation project (walls and basement), new HVAC system, lighting conversion to LED, solar energy installation |
$75,000 |
East Greenbush Community Library |
43 |
107 |
Roof replacement, HVAC system replacement, efficient lighting project, construct a library café space, expand library programming space, kitchen/restroom replacement projects, various other building enhancement projects |
$760,000 |
Grafton Community Library |
43 |
107 |
Renovation/rehabilitation of lower level community meeting room, construct accessible entrance to lower level of the building, redesign service desk/admin office space |
$43,000 |
Nassau Free Library |
43 |
107 |
Renovate and upgrade library community room on the lower level, install a lift to make the lower level accessible, roof replacement, basement masonry work, foundation project to improve drainage and prevent water leakage into the building. |
$150,000 |
North Greenbush Public Library |
43 |
108 |
purchase of property for a new library OR purchase of property with existing building to renovate as a library |
$3,000,000 |
Poestenkill Library |
43 |
107 |
Expansion of library building |
$500,000 |
Sand Lake Town Library |
43 |
107 |
Accessibility upgrades for main entrance and restrooms, window replacement project for energy efficiency, renovation of main adult services space |
$60,000 |
Stephentown Memorial Library |
43 |
107 |
Expansion of public use space in the library, broadband improvement, exterior paining, accessibility enhancements, acquisition of adjacent property for expansion |
$500,000 |
Troy Public Library |
44 |
108 |
Safety Improvements and General Rehabilitation of Main Library building |
$3,000,000 |
Troy Public Library - Lansingburgh |
43 |
107 |
Safety Improvements and General Rehabilitation of branch library building |
$1,300,000 |
Troy Public Library - New Branch Building |
43 |
? |
Property acquisition and construction or renovation for a new branch library |
$3,000,000 |
Valley Falls Free Library |
43 |
107 |
Expand and upgrade facilities for existing building, including handicap accessibility, new roof, basement space improvements |
$87,000 |
System |
Library Name |
County |
Sen. Dist. |
Asy. Dist. |
Project Description |
Amount |
System Total |
Westchester Library System |
System Total |
$143,382,000 |
|
Bedford Free Library |
Westchester |
37 |
93 |
Replace existing roof & HVAC update. Small renovation of the children's & young adult areas of the library |
$200,000 |
Bedford Hills Free Library |
37 |
93 |
Installation of new HVAC and other energy efficiency upgrades. Renovations to interior public spaces. Upgrade to building exterior and property |
$100,000 |
Briarcliff Manor Public Library |
38 |
95 |
Renovation & furnishing of existing 2,300 sq. ft. portion of building |
$1,500,000 |
Bronxville Public Library |
37 |
88 |
Replacement of current HVAC system, including piping and upgrades to electrical infrastructure |
$500,000 |
Chappaqua Library |
40 |
93 |
Emergency exit window for Children’s program room; renovate public restrooms to improve ADA access & energy efficiency; expand Children’s area; expand parking; new roof for 2,200 sq. ft. expansion to Children’s Room |
$7,010,000 |
Croton Free Library |
40 |
95 |
Renovations to meeting room; telecommunications wiring; circulation area renovation |
$195,000 |
Dobbs Ferry Public Library |
35 |
92 |
Replacing front doors with automatic ones |
$50,000 |
Eastchester Public Library |
37 |
88 |
Wall shelving replacement; LED lighting |
$50,000 |
Harrison Public Library |
37 |
93 |
Roof replacement, parking lot expansion, drainage work |
$1,500,000 |
Hastings-on-Hudson Public Library |
35 |
92 |
Interior quite reading room; flat roof replacement |
$140,000 |
Hendrick Hudson Free Library |
40 |
95 |
Renovation of existing building with expansion as a possibility to accommodate growing needs; HVAC & electric upgrades as proposed by energy audit report, including replacement of current HVAC system and changing all exit signs to LED; converting computer room to visible study room, addition of stacks; expand Children’s Area; create area for Literacy program; expand Children’s office space |
$2,000,000 |
Hiram Halle Memorial Library |
40 |
90 |
Expansion & renovation of existing building |
$2,900,000 |
John C. Hart Memorial Library |
40 |
94 |
22,000 sq. ft. addition (including additional study room space, an additional community room, a young adult area, and additional space for public access computers)
Bathroom renovations to make all 3 public bathrooms handicapped accessible, upgrade fixtures to conserve water and install low energy light fixtures |
$10,100,000 |
Katonah Village Library |
37 |
93 |
Meeting rooms renovation; electrical work; better access |
$30,000 |
Mount Pleasant Public Library |
40 |
92 |
Renovate community room; new young adult area; new local history center; additional rooms for the public in basement; new ceiling; new LED lights; gas conversion for heating system; replace windows. |
$1,000,000 |
New Rochelle Public Library |
35 |
91 |
Children’s Room; elevator code compliance; Lawton Avenue entrance renovation |
$1,000,000 |
North Castle Public Library-Armonk |
37 |
93 |
Kent Place Entry ADA Compliance; Generator (Backup during outages); Replace Steam Boiler; LED Lighting in Teen Room; Renovation of magazine room for programming; Abatement & renovation; Replacement of sunroom in Children's Room; Patio entry to Whippoorwill Hall; Renovation of lower level to create new space for teens; Renovate upstairs Teen room to adult programming space; Abatement; Install elevator |
$672,000 |
North White Plains Branch Library [North Castle PL] |
35 |
93 |
Expand viable space; electrical reconfiguration to support public workstations; renovation of community room |
$200,000 |
Ruth Keeler Memorial Library |
40 |
93 |
Addition of a young adult area, storage area, & quiet reading rooms; drainage work |
$1,500,000 |
Rye Free Reading Room |
37 |
91 |
Addition of access to lower level entrance; sprinklers & fire alarm; window replacement, insulation, & other energy-saving initiatives |
$1,000,000 |
Scarsdale Public Library |
35 |
88 |
Complete renovation and addition to make building accessible, address major capital needs (roof, elevator, fire/electrical systems), add community program space, expand children's area, dedicated teen space, increase energy-efficiency, update IT/AV |
$18,000,000 |
Somers Library |
40 |
94 |
7,000 sq. ft. addition (meeting room space, computers, enclosed children’s room, & teen section); new heating/air; efficient windows; efficient lighting; better outdoor lighting; new roof; repair septic system; new carpeting |
$9,500,000 |
The Field Library |
40 |
95 |
Replace existing building |
$25,000,000 |
Tuckahoe Public Library |
37 |
88 |
Alarm; upgrade electric |
$10,000 |
West Harrison Branch Library [Harrison PL] |
37 |
89 |
Additional meeting space; additional space for public access computers; elevator; additional space to house the current collection; upgrades to wiring for electrical equipment & telecommunications |
$5,500,000 |
White Plains Public Library |
35 |
93 |
Three-phase project for Main Floor Renovation including a new Teen Center and middle floor renovations |
$10,000,000 |
Yonkers Public Library - Crestwood Branch |
35 |
89 |
ADA accessibility; HVAC/energy conservation improvements |
$725,000 |
Yonkers Public Library - Grinton I. Will Branch Library |
35 |
89 |
HVAC upgrades, new roof, elevator, façade & window replacement, parking lot expansion, interior improvements |
$9,000,000 |
Yonkers Public Library - Riverfront Library |
35 |
89 |
Teen Room remodeling/expansion; replace automatic doors; finish shell space in basement |
$34,000,000 |